Walgreens on Magazine – Update 3/11/13

Last full week of work at the Magazine Street Walgreens in New Orleans and it is a flurry of activity inside and out.  With one week left, both the Contractor and Walgreens have their work cut out for them, including finishing the front sidewalk and canopy, landscaping and painting the exterior and all the interior shelve stocking and …

Walgreens on Magazine – Update 3/4/13

The building is humming with activity.  At this point Walgreens has been inside the building for almost three weeks setting up shelving and placing fixtures inside the store in anticipation of the late March opening.  The scaffolding has been removed from the front of the building and the new sidewalk work and front canopy is …

Walgreens on Magazine – Update 12/26/12

With the holidays upon us, Magazine Street is buzzing and so is the Walgreens construction site. The interior work now revolves around finalizing all the sheetrock work, floor preparation for italian tile, electrical services and the placement of the American Legion Medallion Logo. When we first looked at the development of this building it was clear from the …

Walgreens on Magazine – Update 12/6/12

Both interior and exterior work are progressing at a good pace this month.  As the photo indicates the address precast stone was placed at the roofline just this week and the brick veneer on Magazine Street is nearly complete.  This will be striking when the scaffolding is removed and when all the fine stucco detail work is …

Walgreens on Magazine – Update 9/21/12

The Front Elevation of the Magazine Street Walgreens is now taking shape with the installation of the Structural Steel Framing and Heavy Gauge Metal Stud Work.  The front sidewalk (not seen) will also be completely replaced with new concrete and brick paver accents to create a beautiful new entry point for the store.  The inside …